Project and Installation
Lancelyn Theatre Supplies has a long track history of installation and service work. Ranging from Primary Schools through to Universities and Specialist Theatre Schools.
Our Projects and Installation team based at the Oxford Branch retain more than 8 full time PAYE Installation Staff and 2 Project Managers, 2 full time workshop staff along with a full design team of 2 x CAD operators.
All staff visiting Educational Establishments have been CRB checked. (Criminal Records Bureau), and have current CSCS Cards.
We typically carry out installation and service work in 80-100 sites per year which is no less than two installations per day.
We design much of our own work, based on commonsense and practicality, we listen to and work with Drama, Premises & Management staff, also architects, consultants, builders and electrical contractors. We are keen to work also with our suppliers and manufacturers to ensure we get the right products at the right level of complexity and price to do the job.
We are NICEIC approved and have been inspected and approved annually since.
We also belong to the ABTT (Association of British Theatre Technicians) – specifically interested in safety issues relating to theatrical installations.
PLASA (Professional Lighting & Sound Association) – Corporate members.
Guild of Master Craftsmen – this organisation takes up references but carries out no audits.
Installation Tel: 01865 251398
Back to top
Major projects completed by the Oxford branch in recent years include:
| Project |
Description |
| Unicorn Theatre Swindon |
|
| Gateway Academy |
|
| Moulsford |
|
| St. Swithuns |
Complete AV & Lighting Installation 300 Seats Waltham Contractors |
| UCC Chichester |
Complete AV Lighting Installation 120 Seats |
| Headington Girls |
Complete design and build Theatre Refurb. 220 Seats |
| King Alfreds School |
72 ch Chilli Dimming (Design and Building project) 100 Seats |
| DLD College |
72 Ch Chilli Dimming Complete Drama Studio (by Michael Holden Assoc) |
| Buscot Park |
Complete Theatre spec (by Michael Holden Assoc) (Sub Contractor – Duncan Woods) |
| Brook Theatre Shenley Brook End School |
Complete Installation Drapes AV & Lighting |
| Comberton Village College |
Complete lighting & Control Strand LD90’s 250 Seats |
| St Georges, Ascot |
Complete Installation AV & Lighting (Sub Contractors – Doug Flude & Duncan Wood) |
| Barking Abbey School |
Complete Installation AV & Lighting (Sub Contractor – Doug Flude) |
| Ashmole School |
Complete AV & Lighting Installation |
| Pegasus Theatre |
Complete Lighting Design & Build 108 Channel Chilli |
| Bob Kayley Theatre |
Complete lighting Spec provided by David Wilkins 96 channel Chilli (Sub Contractor – Doug Flude) |
| Mary Hare School |
Complete Design build 224 seat Theatre |
| University College Cambridge West Road Concert Hall |
*****TEXT REQUIRED****** |
| Gateway Community College |
Multi Purpose Main Hall, AV, Lighting, Sound, Drapes 2 x Drama Spaces |
| Arbourvale |
140 seat Theatre with fully flown above stage rigging |
| Wychwood School |
Full Design and Build |
| St Gregory the Great |
Multi Purpose Main School Hall 300 seat Multi purpose full lighting sound, and AV. |
| South of France |
The Brief was to allow the drinking of fine wine next to pool to carry on long in to the night! So we needed light... | Back to top
Back to top |